ÉTAT HER

Palace Hotel Hakone plans an autumn 2029 return: 69 rooms and a new Sengokuhara resort

Construction has begun on the Hakone redevelopment. A look at its planned room scale, design team and facilities, with future renderings distinguished from a hotel that is already open.

ÉTAT HER Editorial Desk
Palace Hotel Hakone plans an autumn 2029 return: 69 rooms and a new Sengokuhara resort

Palace Hotel Hakone is planned to open in autumn 2029 in Sengokuhara, Hakone, Kanagawa. Palace Hotel, Kyushu Electric Power and Craftia are jointly advancing the redevelopment, following an October 13 groundbreaking ceremony on the former hotel site.

This is a future opening plan. Exterior renderings are not photographs of a completed hotel and do not establish that rooms can already be booked. For Japan-travel readers, the useful details now are location, room scale and design direction, followed by operational information closer to opening.

69 rooms: distinguish the area measurements

The plan calls for 69 rooms, including six suites and five villas, alongside dining and wellness facilities. Announced room areas are 57–250 square metres, or 69–271 square metres when terraces with open-air baths are included. These are different measurement scopes, not a statement that every room starts at 69 square metres.

Future aerial design rendering of Palace Hotel Hakone among wooded slopes
Future aerial design rendering of Palace Hotel Hakone among wooded slopes

Beyond area, consider whether you want a couple’s retreat, a small-family stay or a separate living space. Those needs influence room choice, but the total room count cannot establish rates, occupancy limits or children’s policies. Wait for official room descriptions and booking conditions.

Redevelopment in Sengokuhara is not the former hotel’s operating status

The project is within Fuji-Hakone-Izu National Park. The former property’s predecessor opened in 1960, later operating as Palace Hotel Hakone before closing in January 2018. This is a new redevelopment; old guest reviews cannot describe an actual stay in the new rooms.

Representatives at the Palace Hotel Hakone redevelopment groundbreaking
Representatives at the Palace Hotel Hakone redevelopment groundbreaking

Released renderings show low, extended buildings, layered roofs and surrounding greenery, appearing to follow the terrain. They help explain the direction, but landscaping and final details can change. Weather, views and a room’s actual position are not guaranteed by a rendering.

Design and facilities have an outline; booking details remain ahead

Tara Bernerd & Partners is responsible for the design. Planned facilities include all-day dining, a lounge bar, a speciality restaurant, spa, pool and gym, combining accommodation, meals and relaxation. These are planned elements, not services already available to reserve or use.

For a future Japan itinerary, note the planned autumn 2029 timing and later verify the opening date, reservation launch, rates and transport. There is no need to commit to inflexible travel around an unconfirmed stay date. Following progress is more useful than treating a future hotel as this year’s accommodation option.

Questions and answers

Can guests stay at Palace Hotel Hakone now?

This redevelopment should not be treated as an operating hotel. Opening is planned for autumn 2029; the precise date and booking arrangements need later confirmation.

How many rooms and what sizes are planned?

There are 69 planned rooms, including six suites and five villas. Rooms measure 57–250 square metres, or 69–271 including terraces with open-air baths.

Are the exterior images photographs?

They are future design renderings, not photographs of the completed hotel. The groundbreaking picture records the actual ceremony.

Related reading

Related

Hiroshi Nagai’s STILL HERE in Tokyo: pools, palms and coastlines across about 20 originals
Living

Hiroshi Nagai’s STILL HERE in Tokyo: pools, palms and coastlines across about 20 originals

GALLERY TARGET presents new and earlier originals through November 13, including the original Kimi wa Tennen Shoku cover artwork. Open noon–7 p.m.; closed Mondays, including October 26.

Planning a Meal at Yuen Long’s Chiuchow Garden: Chilli-Oil Scallops, Flambéed Pork and Seafood with Bread
Living

Planning a Meal at Yuen Long’s Chiuchow Garden: Chilli-Oil Scallops, Flambéed Pork and Seafood with Bread

At YOHO MALL I, Chiuchow Garden brings Chiu Chow dishes, spice and Western-inspired ideas together. Consider sharing combinations, the correct branch and questions to ask before booking.

Hoshino’s 2027 Hotel Plans: Choose Between Fukui’s Dinosaur Forest, Ureshino Baths and Asuka Gardens
Living

Hoshino’s 2027 Hotel Plans: Choose Between Fukui’s Dinosaur Forest, Ureshino Baths and Asuka Gardens

RISONARE Fukui is planned for September 10, 2027, HOSHINOYA Asuka for July 22 and KAI Ureshino for summer. Compare their forest architecture, in-room open-air baths, gardens and reservation timelines before choosing a trip.

Taoyuan Halloween City Reopens October 25: Snoopy Displays, the Rescheduled Concert and Key Changes
Living

Taoyuan Halloween City Reopens October 25: Snoopy Displays, the Rescheduled Concert and Key Changes

Organisers confirm activities resume at noon on October 25. The opening concert moves to October 26, while Snoopy meet-and-greet times remain pending. Separate installations, animation and changed performance dates before visiting.

New York Halloween Stoops: Giant Pumpkins, Autumn Gardens and Gothic Entrances
Living

New York Halloween Stoops: Giant Pumpkins, Autumn Gardens and Gothic Entrances

A nearly thousand-pound Brooklyn pumpkin, an Upper West Side autumn garden and a red-and-black Gothic doorway offer three ways to build a seasonal scene in a limited space.

Bangkok’s American Fair runs through October 25: free entry, music, food and satellite-image names
Living

Bangkok’s American Fair runs through October 25: free entry, music, food and satellite-image names

Parc Paragon and SCBX Next Tech combine food, performances, games and technology. Check the two locations, Thailand’s 11am–9pm opening hours and the distinction between daily programmes.